Project Overview

Kraft Foods – Whey Tank

Provide design and construct infrastructure to support 50,000 gallon whey tank silo. Project required to set the silo, with minimal shutdown time to the facility, while maintaining normal operations.

CLIENT: Kraft Foods ROLE: General Contractor LOCATION: Walton, NY