Project Overview

Kraft Foods – Flood Prevention

After the flood of 2006 that devastated the Kraft Food plant in Walton, NY; Kraft decided to protect the future of the plan by installing a flood control plan. Eastman Associates installed 1300 cubic yards of concrete floodwalls at the perimeter of the facility, installed flood gates, relocated utilities, installed a new storm water drainage system, and concrete pavement.

CLIENT: ROLE: Prime Contractor LOCATION: Walton, NY